2003 PROJECTS

2003 Projects:

ETNIES Shoes - Anthem Outlet Mall
PHOENIX, ARIZONA

PROJECT DESCRIPTION....This project involved the remodel of two tenant spaces into a single 4800 Square Foot space for use by ETNIES Shoes.

SERVICES PROVIDED....Electrical Engineering

CLIENT......Davis Contracting, Owner: Mike Davis

RESULTS......Work was completed in four (4) calendar days and approved by the City of Phoenix without comment. Construction was completed without a single electrical RFI or change order.

J S Star Image - Metrocenter Mall
PHOENIX, ARIZONA

PROJECT DESCRIPTION....This project involved the remodel of a 2000 square foot tenant space for a specialty photography studio.

SERVICES PROVIDED....Electrical Engineering

CLIENT......Koo'n Design Build, Architect: Hoon Koo

RESULTS......Electrical construction is complete without a single electrical RFI or change order.

The Village at Bell and Reems
SITE LIGHTING
SURPRISE, ARIZONA

PROJECT DESCRIPTION....This project required specification of site lighting fixtures, photometric analysis, and design of power and control systems for common areas of this new shopping center.

SERVICES PROVIDED....Electrical Engineering

CLIENT......Jeffrey Wogan Architects, Architect: Jeffrey Wogan

RESULTS......This design was approved by the City of Surprise without comment and constructed without a single RFI or change order.

The Village at Bell and Reems
UTILITY DISTRIBUTION
SURPRISE, ARIZONA

PROJECT DESCRIPTION....This project required coordination with local utilities (Electric, Telephone, Cable, and Gas) and the property owner to identify necessary easements and the location of utility equipment.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Jeffrey Wogan Architects, Architect: Jeffrey Wogan

RESULTS......This design was implemented by the local Utility with only minor revisions and constructed without a single RFI or change order.

Boba Internet Club
TEMPE, ARIZONA

PROJECT DESCRIPTION....This project required the remodel of a 1500 square foot tenant space for 40 personal computers and work stations.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Koo'n Design Build, Architect: Hoon Koo

RESULTS......This project was completed in four (4) days and approved by the City of Tempe without comment. Construction has been completed.

New Electrical Service
Executive Office Center

SCOTTSDALE, ARIZONA

PROJECT DESCRIPTION....This project required a tenant space to be electrically separated from an adjacent tenant space and provided a dedicated utility meter.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Sun Best Builders, Project Manager: Pat Bolen

RESULTS......This project was completed in six (6) days and approved by the City of Scottsdale without comment. Construction was completed without a single RFI or change order.

Quizno's Sub
83d Ave & Encanto

PHOENIX, ARIZONA

PROJECT DESCRIPTION....This project was a new prototype design for a national fast food restaurant.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Studio W2: Architect: Lauri McNeill

RESULTS......This prototype project was completed in ten (10) days and was approved by the City of Phoenix without comment. The project was constructed without a single RFI or change order.

Quizno's Sub
4730 E. Lone Mountain Road

PHOENIX, ARIZONA

PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Studio W2: Architect: Lauri McNeill

RESULTS......This prototype project was completed in twelve (12) days, without existing electrical drawings for the shell building. It was approved without comment by the City of Phoenix. The project was completed with only minor questions from the contractor and no change orders.

Submarino's Restaurant
SEC 75th Avenue & Thunderbird

PEORIA, ARIZONA

PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Jeffrey Wogan, Architects,Architect: Jeffrey Wogan

RESULTS......This prototype project was completed in two (2) days and was approved by the City of Peoria without comment. This project was completed without an RFI from the contractor. The City of Peoria required exterior emergency lighting be added in the field, resulting in a change order to the owner.

Quizno's Sub
50 S. Houghton Road

TUCSON, ARIZONA

PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Studio W2: Architect: Lauri McNeill

RESULTS......This prototype project was completed in five (5) days, without electrical drawings of the existing shell building, and was approved by the City of Tucson without comment. The project was constructed without a single RFI or change order from the contractor.

Quizno's Sub
7520 N. LaCholla Blvd.

TUCSON, ARIZONA

PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Studio W2: Architect: Lauri McNeill

RESULTS......This prototype project was completed in five (5) days, without electrical drawings of the existing shell building. The design was approved by the City of Tucson without comments. The project was constructed without a single RFI or change order from the contractor.

Woltmon Residence
PHOENIX, ARIZONA

PROJECT DESCRIPTION....Electrical design (Single- line diagram, calculations, panel schedules) for a 5000 square foot residence.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......PAL & Associates, Architects: Sukumar Pal, Architect.

RESULTS......This prototype project was completed in one (1) day. The deign was approved by the City without comment and constructed without a single RFI or change order.

Aqua Fina Water & Ice Store
67 N. Dobson Road

MESA, ARIZONA

PROJECT DESCRIPTION....This project is a new Water & Ice franchise store in an existing vanilla shell tenant space.

SERVICES PROVIDED.... Electrical Engineering

CLIENT......Koo'n Design Build, Architect: Hoon Koo

RESULTS......This prototype project was completed in three (3) days and was approved by the City of Mesa without comment. The project required additional circuits for equipment added by the owner in the field, but was otherwise completed without a change order.