PROJECT DESCRIPTION....This project involved the remodel of two tenant spaces into a single 4800 Square Foot space for use by ETNIES Shoes.
SERVICES PROVIDED....Electrical EngineeringCLIENT......Davis Contracting, Owner: Mike Davis
RESULTS......Work was completed in four (4) calendar days and approved by the City of Phoenix without comment. Construction was completed without a single electrical RFI or change order.
PROJECT DESCRIPTION....This project involved the remodel of a 2000 square foot tenant space for a specialty photography studio.
SERVICES PROVIDED....Electrical EngineeringCLIENT......Koo'n Design Build, Architect: Hoon Koo
RESULTS......Electrical construction is complete without a single electrical RFI or change order.
PROJECT DESCRIPTION....This project required specification of site lighting fixtures, photometric analysis, and design of power and control systems for common areas of this new shopping center.
SERVICES PROVIDED....Electrical EngineeringCLIENT......Jeffrey Wogan Architects, Architect: Jeffrey Wogan
RESULTS......This design was approved by the City of Surprise without comment and constructed without a single RFI or change order.
PROJECT DESCRIPTION....This project required coordination with local utilities (Electric, Telephone, Cable, and Gas) and the property owner to identify necessary easements and the location of utility equipment.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Jeffrey Wogan Architects, Architect: Jeffrey Wogan
RESULTS......This design was implemented by the local Utility with only minor revisions and constructed without a single RFI or change order.
PROJECT DESCRIPTION....This project required the remodel of a 1500 square foot tenant space for 40 personal computers and work stations.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Koo'n Design Build, Architect: Hoon Koo
RESULTS......This project was completed in four (4) days and approved by the City of Tempe without comment. Construction has been completed.
PROJECT DESCRIPTION....This project required a tenant space to be electrically separated from an adjacent tenant space and provided a dedicated utility meter.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Sun Best Builders, Project Manager: Pat Bolen
RESULTS......This project was completed in six (6) days and approved by the City of Scottsdale without comment. Construction was completed without a single RFI or change order.
PROJECT DESCRIPTION....This project was a new prototype design for a national fast food restaurant.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Studio W2: Architect: Lauri McNeill
RESULTS......This prototype project was completed in ten (10) days and was approved by the City of Phoenix without comment. The project was constructed without a single RFI or change order.
PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Studio W2: Architect: Lauri McNeill
RESULTS......This prototype project was completed in twelve (12) days, without existing electrical drawings for the shell building. It was approved without comment by the City of Phoenix. The project was completed with only minor questions from the contractor and no change orders.
PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Jeffrey Wogan, Architects,Architect: Jeffrey Wogan
RESULTS......This prototype project was completed in two (2) days and was approved by the City of Peoria without comment. This project was completed without an RFI from the contractor. The City of Peoria required exterior emergency lighting be added in the field, resulting in a change order to the owner.
PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Studio W2: Architect: Lauri McNeill
RESULTS......This prototype
project was completed in five (5) days, without electrical drawings of the existing
shell building, and was approved by the City of Tucson without comment. The project
was constructed without a single RFI or change order from the contractor.
PROJECT DESCRIPTION....This project is a new design for a fast food restaurant in an existing tenant space.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Studio W2: Architect: Lauri McNeill
RESULTS......This prototype
project was completed in five (5) days, without electrical drawings of the existing
shell building. The design was approved by the City of Tucson without comments.
The project was constructed without a single RFI or change order from the contractor.
PROJECT DESCRIPTION....Electrical design (Single- line diagram, calculations, panel schedules) for a 5000 square foot residence.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......PAL & Associates, Architects: Sukumar Pal, Architect.
RESULTS......This prototype
project was completed in one (1) day. The deign was approved by the City without
comment and constructed without a single RFI or change order.
PROJECT DESCRIPTION....This project is a new Water & Ice franchise store in an existing vanilla shell tenant space.
SERVICES PROVIDED.... Electrical EngineeringCLIENT......Koo'n Design Build, Architect: Hoon Koo
RESULTS......This prototype
project was completed in three (3) days and was approved by the City of Mesa without
comment. The project required additional circuits for equipment added by the owner
in the field, but was otherwise completed without a change order. Copyright © 2003 - PolyPhase Engineering